Richmond · TW9 · TW10

Bathroom Renovation in Richmond, TW9

Bathroom design and installation in Richmond: family bathrooms, en-suites and wet rooms, designed as complete rooms and fitted by our own trades.

Covered under one contract

  • Design and 3D layout
  • Italian and German made-to-measure kitchens
  • Worktops templated and fitted
  • Built-in appliances supplied and installed
  • Bathrooms designed as complete rooms
  • Plumbing, electrics and tiling by our own trades
Call us on 07939 239238

Bathroom Renovation in Richmond.

A bathroom is a small room where everything has to be right at once: the layout, the tiling, the underfloor heating, the lighting, the furniture and the brassware. We design it as a whole and fit it with our own plumbers, electricians and tilers, which is why our bathrooms in Richmond and across London are finished to a showroom standard.

Many of the bathrooms we do are in older houses and flats, where the questions are practical: where the soil stack is, whether an en-suite can be squeezed from a bedroom or landing, how to ventilate an internal room. We answer them at the site visit before anything is drawn.

Sanitaryware, furniture and tiles are chosen from samples we bring to you, and a typical bathroom takes two to three weeks on site from strip-out to finished brassware once the design is agreed and the materials have arrived.

Bathroom Renovation across London

At a glance
Area
Richmond, TW9 · TW10
Council
London Borough of Richmond upon Thames
Housing
Georgian houses around the Green and on the Hill, Victorian villas and terraces, Edwardian family houses, riverside apartments
Transport
Richmond (District, Overground, rail), Kew Gardens
Bathroom refit
2 to 3 weeks
Ranges
Aster Cucine (Italy), Schüller (Germany)
South-West London

Richmond: the houses and the planning rules.

Richmond has Georgian houses around the Green and up the Hill, Victorian villas along the roads to the Park, and Edwardian streets between the station and Kew. The view from Richmond Hill is protected by Act of Parliament, and the conservation areas are among the most carefully managed in outer London.

Refurbishments here range from listed Georgian townhouses to Edwardian family houses that want a kitchen extension and a loft. The council's design guidance is detailed and its conservation officers are engaged, so the drawings and heritage statement are prepared to match.

The Richmond Town, Richmond Hill, Richmond Green and Kew Green conservation areas cover the centre and the riverside, and many houses are listed.

London Borough of Richmond upon Thames

Richmond decides applications and publishes detailed house extension guidance; Article 4 directions apply in several conservation areas.

Listed buildings

Around the Green and on the Hill most houses are listed; internal changes need listed building consent.

The view

The protected view from Richmond Hill and the Thames Policy Area affect roof extensions and riverside sites.

Approvals for bathroom renovation in Richmond.

Bathrooms do not need planning permission, but new plumbing, electrics in wet zones and ventilation need building regulations approval, and flats usually need the freeholder's consent for changes to services.

Richmond decides applications and publishes detailed house extension guidance; Article 4 directions apply in several conservation areas.

What bathroom renovation in Richmond includes.

  • Design and 3D layout
  • Italian and German made-to-measure kitchens
  • Worktops templated and fitted
  • Built-in appliances supplied and installed
  • Bathrooms designed as complete rooms
  • Plumbing, electrics and tiling by our own trades
How we work

From site visit to handover.

  1. 01

    Site visit & consultation

    We visit, listen and measure. Brief, budget and constraints understood before any advice is given.

  2. 02

    Design & itemised quote

    Our architects and engineers draw the scheme, and from that we provide a transparent, itemised quotation for your approval.

  3. 03

    Planning & approvals

    Planning applications, building control and party wall matters handled for you.

  4. 04

    Build, managed weekly

    Our own trades, sequenced by a site manager. Progress reported every week.

  5. 05

    Handover & aftercare

    Joint snagging walk-through, documentation, and a guarantee on our workmanship.

Common questions

Bathroom Renovation in Richmond: your questions.

How long does a bathroom refit take?

Two to three weeks on site from strip-out to finished tiling and brassware, once the design is agreed and the sanitaryware has arrived.

Can you add an en-suite in a Richmond house?

Usually, by taking space from a bedroom or a landing. Drainage falls and soil stack positions decide where it can go; we check these at the site visit before drawing options.

Which parts of Richmond do you cover?

All of Richmond and TW9 · TW10, including Richmond Hill, The Green, Kew Road, Sheen Road, Queens Road, Marlborough Road, and the neighbouring districts. We are based in London and our teams work across central, north, north-west, west and south-west London.

Start a project

Talk to us about a new bathroom in Richmond.

We will visit, listen and explain what is possible for your property and how it would be approved. No pressure, no sales pitch.