Marylebone · W1 · NW1

Bathroom Renovation in Marylebone, W1

Bathroom design and installation in Marylebone: family bathrooms, en-suites and wet rooms, designed as complete rooms and fitted by our own trades.

Covered under one contract

  • Design and 3D layout
  • Italian and German made-to-measure kitchens
  • Worktops templated and fitted
  • Built-in appliances supplied and installed
  • Bathrooms designed as complete rooms
  • Plumbing, electrics and tiling by our own trades
Call us on 07939 239238

Bathroom Renovation in Marylebone.

A bathroom is a small room where everything has to be right at once: the layout, the tiling, the underfloor heating, the lighting, the furniture and the brassware. We design it as a whole and fit it with our own plumbers, electricians and tilers, which is why our bathrooms in Marylebone and across London are finished to a showroom standard.

Many of the bathrooms we do are in older houses and flats, where the questions are practical: where the soil stack is, whether an en-suite can be squeezed from a bedroom or landing, how to ventilate an internal room. We answer them at the site visit before anything is drawn.

Sanitaryware, furniture and tiles are chosen from samples we bring to you, and a typical bathroom takes two to three weeks on site from strip-out to finished brassware once the design is agreed and the materials have arrived.

Bathroom Renovation across London

At a glance
Area
Marylebone, W1 · NW1
Council
City of Westminster
Housing
Georgian and early Victorian terraces, mews houses, mansion blocks and converted flats
Transport
Baker Street, Marylebone, Bond Street
Bathroom refit
2 to 3 weeks
Ranges
Aster Cucine (Italy), Schüller (Germany)
Central London

Marylebone: the houses and the planning rules.

Marylebone is where Space Cucina started, as a kitchen company on Seymour Place. The district is a grid of Georgian and early Victorian streets laid out by the Portman and Howard de Walden estates: flat-fronted brick terraces, stucco around the squares, mews houses behind, and the great mansion blocks of Marylebone Road and Baker Street.

Most of the housing is now flats, from mansion-block apartments to lateral conversions across two houses, which makes refurbishment here as much about approvals and logistics as about design: licences to alter, estate consent, parking suspensions and lift access all shape the programme. We have refurbished bathrooms on Marylebone Road and fitted kitchens for clients across the district.

The Portman Estate, Harley Street and Dorset Square conservation areas cover almost all of it.

Westminster City Council

Applications go to Westminster. Almost the whole district is within conservation areas, and many terraces are Grade II listed, so internal changes to listed houses need listed building consent.

Estate consent

On the Portman and Howard de Walden estates, the freeholder's own approval is needed in addition to planning, with their own design guidance for windows, roofs and rear elevations.

Mansion flats

Block rules govern working hours, deliveries and noise. We plan the programme around them and coordinate with the managing agent.

Approvals for bathroom renovation in Marylebone.

Bathrooms do not need planning permission, but new plumbing, electrics in wet zones and ventilation need building regulations approval, and flats usually need the freeholder's consent for changes to services.

Applications go to Westminster. Almost the whole district is within conservation areas, and many terraces are Grade II listed, so internal changes to listed houses need listed building consent.

What bathroom renovation in Marylebone includes.

  • Design and 3D layout
  • Italian and German made-to-measure kitchens
  • Worktops templated and fitted
  • Built-in appliances supplied and installed
  • Bathrooms designed as complete rooms
  • Plumbing, electrics and tiling by our own trades
How we work

From site visit to handover.

  1. 01

    Site visit & consultation

    We visit, listen and measure. Brief, budget and constraints understood before any advice is given.

  2. 02

    Design & itemised quote

    Our architects and engineers draw the scheme, and from that we provide a transparent, itemised quotation for your approval.

  3. 03

    Planning & approvals

    Planning applications, building control and party wall matters handled for you.

  4. 04

    Build, managed weekly

    Our own trades, sequenced by a site manager. Progress reported every week.

  5. 05

    Handover & aftercare

    Joint snagging walk-through, documentation, and a guarantee on our workmanship.

Common questions

Bathroom Renovation in Marylebone: your questions.

How long does a bathroom refit take?

Two to three weeks on site from strip-out to finished tiling and brassware, once the design is agreed and the sanitaryware has arrived.

Can you add an en-suite in a Marylebone house?

Usually, by taking space from a bedroom or a landing. Drainage falls and soil stack positions decide where it can go; we check these at the site visit before drawing options.

Which parts of Marylebone do you cover?

All of Marylebone and W1 · NW1, including Seymour Place, Marylebone High Street, Montagu Square, Dorset Square, Harley Street, Baker Street, and the neighbouring districts. We are based in London and our teams work across central, north, north-west, west and south-west London.

Start a project

Talk to us about a new bathroom in Marylebone.

We will visit, listen and explain what is possible for your property and how it would be approved. No pressure, no sales pitch.