Marylebone · W1 · NW1

Structural Alterations in Marylebone, W1

Opening up the ground floor, removing load-bearing walls and forming new openings in Marylebone houses, with our own structural engineers and building control approval.

Covered under one contract

  • Architectural and structural design
  • Planning or lawful development certificate
  • Foundations, walls, roof and steels
  • Glazing, rooflights and doors
  • Kitchen designed and fitted
  • Building control and party wall handled
Call us on 07939 239238

Structural Alterations in Marylebone.

Most of the houses in Marylebone were planned as a series of small rooms. Opening them up, whether that is knocking two reception rooms together, taking out the wall between the kitchen and dining room, or forming a wide opening onto the garden, is structural work, and it needs to be designed rather than improvised.

Our engineers design the steel beams, padstones and any temporary works, and our team installs them. The beam is usually hidden within the ceiling so the finished room shows no trace of the wall that was there. Building control inspects the work, and where the wall is shared with a neighbour we serve the party wall notices.

Structural alterations are often the first stage of a wider refurbishment, and we plan them as such, so the services, floor levels and finishes that follow are all designed together.

Structural Alterations across London

At a glance
Area
Marylebone, W1 · NW1
Council
City of Westminster
Housing
Georgian and early Victorian terraces, mews houses, mansion blocks and converted flats
Transport
Baker Street, Marylebone, Bond Street
Rear or side return, on site
10 to 16 weeks
Design and approvals
8 to 14 weeks before start
Glazing lead time
6 to 10 weeks, ordered early
Consent
Permitted development or householder application
Party wall
Notices served by us
Central London

Marylebone: the houses and the planning rules.

Marylebone is where Space Cucina started, as a kitchen company on Seymour Place. The district is a grid of Georgian and early Victorian streets laid out by the Portman and Howard de Walden estates: flat-fronted brick terraces, stucco around the squares, mews houses behind, and the great mansion blocks of Marylebone Road and Baker Street.

Most of the housing is now flats, from mansion-block apartments to lateral conversions across two houses, which makes refurbishment here as much about approvals and logistics as about design: licences to alter, estate consent, parking suspensions and lift access all shape the programme. We have refurbished bathrooms on Marylebone Road and fitted kitchens for clients across the district.

The Portman Estate, Harley Street and Dorset Square conservation areas cover almost all of it.

Westminster City Council

Applications go to Westminster. Almost the whole district is within conservation areas, and many terraces are Grade II listed, so internal changes to listed houses need listed building consent.

Estate consent

On the Portman and Howard de Walden estates, the freeholder's own approval is needed in addition to planning, with their own design guidance for windows, roofs and rear elevations.

Mansion flats

Block rules govern working hours, deliveries and noise. We plan the programme around them and coordinate with the managing agent.

Approvals for structural alterations in Marylebone.

Structural work needs building regulations approval and an engineer's calculations; where the wall is shared with a neighbour, party wall notices are required, and listed buildings need listed building consent for internal alterations.

Applications go to Westminster. Almost the whole district is within conservation areas, and many terraces are Grade II listed, so internal changes to listed houses need listed building consent.

What structural alterations in Marylebone includes.

  • Architectural and structural design
  • Planning or lawful development certificate
  • Foundations, walls, roof and steels
  • Glazing, rooflights and doors
  • Kitchen designed and fitted
  • Building control and party wall handled
How we work

From site visit to handover.

  1. 01

    Site visit & consultation

    We visit, listen and measure. Brief, budget and constraints understood before any advice is given.

  2. 02

    Design & itemised quote

    Our architects and engineers draw the scheme, and from that we provide a transparent, itemised quotation for your approval.

  3. 03

    Planning & approvals

    Planning applications, building control and party wall matters handled for you.

  4. 04

    Build, managed weekly

    Our own trades, sequenced by a site manager. Progress reported every week.

  5. 05

    Handover & aftercare

    Joint snagging walk-through, documentation, and a guarantee on our workmanship.

Common questions

Structural Alterations in Marylebone: your questions.

Can you remove a load-bearing wall in a Marylebone house?

Yes. Our structural engineer designs the steel beam and padstones, building control inspects the work, and if the wall is a party wall we serve the notices. The beam can usually be concealed within the ceiling depth.

Do structural alterations need planning permission?

Internal structural work does not need planning permission, but it always needs building regulations approval. Listed buildings need listed building consent for internal alterations.

Which parts of Marylebone do you cover?

All of Marylebone and W1 · NW1, including Seymour Place, Marylebone High Street, Montagu Square, Dorset Square, Harley Street, Baker Street, and the neighbouring districts. We are based in London and our teams work across central, north, north-west, west and south-west London.

Start a project

Talk to us about structural work in Marylebone.

We will visit, listen and explain what is possible for your property and how it would be approved. No pressure, no sales pitch.