Marylebone · W1 · NW1

Kitchen Renovation in Marylebone, W1

Kitchen design, supply and installation in Marylebone: made-to-measure Italian and German kitchens, designed at your home and fitted by our own team.

Covered under one contract

  • Design and 3D layout
  • Italian and German made-to-measure kitchens
  • Worktops templated and fitted
  • Built-in appliances supplied and installed
  • Bathrooms designed as complete rooms
  • Plumbing, electrics and tiling by our own trades
Call us on 07939 239238

Kitchen Renovation in Marylebone.

Space Cucina began as a kitchen company, and kitchens are still at the centre of what we do. We design, supply and fit kitchens across Marylebone, either on their own or as part of an extension or refurbishment, with the furniture made to measure in Italy or Germany and the worktops, appliances and lighting specified alongside it.

The process starts at your home, with door, worktop and finish samples brought to you. We measure, talk through how you cook and live, and produce a design with drawings and a full specification. Once it is signed off, the kitchen goes into production and arrives six to eight weeks later; fitting, including worktop templating, takes one to two weeks.

Because our own electricians, plumbers and fitters do the work, the practical side, moving services, adding an island, running extraction, is dealt with as part of the design, not discovered on the day.

Kitchen Renovation across London

At a glance
Area
Marylebone, W1 · NW1
Council
City of Westminster
Housing
Georgian and early Victorian terraces, mews houses, mansion blocks and converted flats
Transport
Baker Street, Marylebone, Bond Street
Kitchen lead time
6 to 8 weeks from sign-off
Kitchen fitting
1 to 2 weeks including templating
Ranges
Aster Cucine (Italy), Schüller (Germany)
Appliances
Bosch, Neff, Siemens, Miele, Gaggenau and others
Central London

Marylebone: the houses and the planning rules.

Marylebone is where Space Cucina started, as a kitchen company on Seymour Place. The district is a grid of Georgian and early Victorian streets laid out by the Portman and Howard de Walden estates: flat-fronted brick terraces, stucco around the squares, mews houses behind, and the great mansion blocks of Marylebone Road and Baker Street.

Most of the housing is now flats, from mansion-block apartments to lateral conversions across two houses, which makes refurbishment here as much about approvals and logistics as about design: licences to alter, estate consent, parking suspensions and lift access all shape the programme. We have refurbished bathrooms on Marylebone Road and fitted kitchens for clients across the district.

The Portman Estate, Harley Street and Dorset Square conservation areas cover almost all of it.

Westminster City Council

Applications go to Westminster. Almost the whole district is within conservation areas, and many terraces are Grade II listed, so internal changes to listed houses need listed building consent.

Estate consent

On the Portman and Howard de Walden estates, the freeholder's own approval is needed in addition to planning, with their own design guidance for windows, roofs and rear elevations.

Mansion flats

Block rules govern working hours, deliveries and noise. We plan the programme around them and coordinate with the managing agent.

Approvals for kitchen renovation in Marylebone.

A new kitchen does not need planning permission, but moving services, new electrics and gas work need building regulations approval and certification, and flats usually need the freeholder's consent for changes to services.

Applications go to Westminster. Almost the whole district is within conservation areas, and many terraces are Grade II listed, so internal changes to listed houses need listed building consent.

What kitchen renovation in Marylebone includes.

  • Design and 3D layout
  • Italian and German made-to-measure kitchens
  • Worktops templated and fitted
  • Built-in appliances supplied and installed
  • Bathrooms designed as complete rooms
  • Plumbing, electrics and tiling by our own trades
How we work

From site visit to handover.

  1. 01

    Site visit & consultation

    We visit, listen and measure. Brief, budget and constraints understood before any advice is given.

  2. 02

    Design & itemised quote

    Our architects and engineers draw the scheme, and from that we provide a transparent, itemised quotation for your approval.

  3. 03

    Planning & approvals

    Planning applications, building control and party wall matters handled for you.

  4. 04

    Build, managed weekly

    Our own trades, sequenced by a site manager. Progress reported every week.

  5. 05

    Handover & aftercare

    Joint snagging walk-through, documentation, and a guarantee on our workmanship.

Common questions

Kitchen Renovation in Marylebone: your questions.

Do you fit kitchens in Marylebone without other building work?

Yes. We design, supply and fit kitchens on their own as well as within extensions and refurbishments. We bring door, worktop and finish samples to the site visit, so you choose everything in the room it is going into.

How long does a new kitchen take?

Made-to-measure kitchens from Italy and Germany take six to eight weeks from sign-off to delivery, then one to two weeks to fit, including worktop templating.

Which parts of Marylebone do you cover?

All of Marylebone and W1 · NW1, including Seymour Place, Marylebone High Street, Montagu Square, Dorset Square, Harley Street, Baker Street, and the neighbouring districts. We are based in London and our teams work across central, north, north-west, west and south-west London.

Start a project

Talk to us about a new kitchen in Marylebone.

We will visit, listen and explain what is possible for your property and how it would be approved. No pressure, no sales pitch.