Rear · Side return · Wraparound · Structural

House extensions and structural alterations in London

Bespoke rear, side and wrap-around extensions, alongside structural alterations to transform and expand your home.

Covered under one contract

  • Architectural and structural design
  • Planning or lawful development certificate
  • Foundations, walls, roof and steels
  • Glazing, rooflights and doors
  • Kitchen designed and fitted
  • Building control and party wall handled
Call us on 07939 239238
  • 200+Projects successfully completed
  • In-houseArchitects & structural engineers
  • ApprovalsPlanning, listed & building control
  • InsuredPublic & employer's liability

Extensions & structural alterations with Space Cucina.

Who doesn't want more space? Our extensions are designed by our own architects and structural engineers and built by experienced local tradesmen, with our head designer giving the finished rooms the final touch.

Structural alterations, such as removing walls to open up a kitchen and dining space, are engineered and built by the same team, with steels, building control and party wall matters handled for you.

See extension, loft and basement projects

At a glance
Rear or side return, on site
10 to 16 weeks
Design and approvals
8 to 14 weeks before start
Glazing lead time
6 to 10 weeks, ordered early
Consent
Permitted development or householder application
Party wall
Notices served by us
Rear kitchen extension on a London terraced house with slim-frame sliding doors and a rooflight
Scope of works

What extensions & structural alterations actually includes.

Comprehensive is not a marketing word here. Every item below is delivered, certified where required and guaranteed under the same contract.

Design and structure

Options for rear, side-return, wraparound or double-storey, then drawings and engineer's calculations for steels, foundations and openings.

Approvals

Permitted development check or planning application, building regulations submission and party wall notices.

Groundworks

Excavation, foundations to building control's requirements, drainage connections and damp-proofing.

Structure and roof

Walls in matching brick or render, steel beams and the opening into the existing house, flat or pitched roof with insulation and rooflights.

Glazing

Slim-frame sliding or bi-fold doors and rooflights specified for light, security and thermal performance.

First fix

Electrics, plumbing, underfloor heating and drainage built into the new floor before plastering.

Kitchen and finishes

The kitchen designed with the extension from the first drawing, fitted after plastering, then flooring and decoration.

External works

Patio, paths, drainage and garden reinstatement completed within the contract, and building control sign-off.

Types of extension

  • Rear extension: the most common way to create an open-plan kitchen and dining space
  • Side return: reclaims the strip beside a Victorian or Edwardian terrace
  • Wraparound: rear and side return combined for the largest gain
  • Double storey: a bedroom or bathroom above the new ground floor
  • Conservatories and garden rooms

Structural alterations

  • Removing load-bearing walls and installing steel beams
  • New openings for bi-fold and sliding doors
  • Chimney breast removal
  • Reconfiguring layouts across a floor
How an extension runs

From site visit to handover.

  1. 01

    Site visit & consultation

    We visit, listen and measure. Brief, budget and constraints understood before any advice is given.

  2. 02

    Design & itemised quote

    Our architects and engineers draw the scheme, and from that we provide a transparent, itemised quotation for your approval.

  3. 03

    Planning & approvals

    Planning applications, building control and party wall matters handled for you.

  4. 04

    Build, managed weekly

    Our own trades, sequenced by a site manager. Progress reported every week.

  5. 05

    Handover & aftercare

    Joint snagging walk-through, documentation, and a guarantee on our workmanship.

Common questions

Extensions & structural alterations: what people ask us.

What decides the cost of a rear extension?

Size, ground conditions and drains, the amount of structural work into the existing house, the size and type of glazing, the roof design, and the level of finish inside. A kitchen extension with a large sliding door, a rooflight and a new kitchen is a different project from a simple rear room.

We quote after the site visit with an itemised breakdown, so you can see the cost of the shell separately from the glazing, the kitchen and the finishes, and adjust before work starts.

Rear extension or side return: which is better for a terraced house?

A side-return extension fills the narrow strip beside the original back addition of a Victorian or Edwardian terrace, turning a narrow galley kitchen into a wide room without losing much garden. A rear extension adds depth instead. A wraparound combines both and gives the largest open-plan space, though it costs the most and usually needs a planning application rather than permitted development. We draw options for both so you can compare the space gained against the cost.

Can you remove a load-bearing wall?

Yes. Removing a load-bearing wall means installing a steel beam, designed by our structural engineer, with padstones and sometimes new foundations below. The work needs building regulations approval and, where the wall is shared with a neighbour, a party wall notice. Done properly it is routine; the beam can be hidden within the ceiling depth so the two rooms read as one.

How long does an extension take to build?

A single-storey rear or side-return extension usually takes ten to sixteen weeks on site once approvals are in place, from breaking ground to a finished kitchen. Add four to eight weeks beforehand for design and approvals if starting from scratch, and allow for glazing lead times of six to ten weeks, which we order as soon as the structure is confirmed.

Start a project

Talk to us about a rear or side-return extension.

We will visit, listen and explain what is possible for your property and how it would be approved. No pressure, no sales pitch.