Richmond · TW9 · TW10

Structural Alterations in Richmond, TW9

Opening up the ground floor, removing load-bearing walls and forming new openings in Richmond houses, with our own structural engineers and building control approval.

Covered under one contract

  • Architectural and structural design
  • Planning or lawful development certificate
  • Foundations, walls, roof and steels
  • Glazing, rooflights and doors
  • Kitchen designed and fitted
  • Building control and party wall handled
Call us on 07939 239238

Structural Alterations in Richmond.

Most of the houses in Richmond were planned as a series of small rooms. Opening them up, whether that is knocking two reception rooms together, taking out the wall between the kitchen and dining room, or forming a wide opening onto the garden, is structural work, and it needs to be designed rather than improvised.

Our engineers design the steel beams, padstones and any temporary works, and our team installs them. The beam is usually hidden within the ceiling so the finished room shows no trace of the wall that was there. Building control inspects the work, and where the wall is shared with a neighbour we serve the party wall notices.

Structural alterations are often the first stage of a wider refurbishment, and we plan them as such, so the services, floor levels and finishes that follow are all designed together.

Structural Alterations across London

At a glance
Area
Richmond, TW9 · TW10
Council
London Borough of Richmond upon Thames
Housing
Georgian houses around the Green and on the Hill, Victorian villas and terraces, Edwardian family houses, riverside apartments
Transport
Richmond (District, Overground, rail), Kew Gardens
Rear or side return, on site
10 to 16 weeks
Design and approvals
8 to 14 weeks before start
Glazing lead time
6 to 10 weeks, ordered early
Consent
Permitted development or householder application
Party wall
Notices served by us
South-West London

Richmond: the houses and the planning rules.

Richmond has Georgian houses around the Green and up the Hill, Victorian villas along the roads to the Park, and Edwardian streets between the station and Kew. The view from Richmond Hill is protected by Act of Parliament, and the conservation areas are among the most carefully managed in outer London.

Refurbishments here range from listed Georgian townhouses to Edwardian family houses that want a kitchen extension and a loft. The council's design guidance is detailed and its conservation officers are engaged, so the drawings and heritage statement are prepared to match.

The Richmond Town, Richmond Hill, Richmond Green and Kew Green conservation areas cover the centre and the riverside, and many houses are listed.

London Borough of Richmond upon Thames

Richmond decides applications and publishes detailed house extension guidance; Article 4 directions apply in several conservation areas.

Listed buildings

Around the Green and on the Hill most houses are listed; internal changes need listed building consent.

The view

The protected view from Richmond Hill and the Thames Policy Area affect roof extensions and riverside sites.

Approvals for structural alterations in Richmond.

Structural work needs building regulations approval and an engineer's calculations; where the wall is shared with a neighbour, party wall notices are required, and listed buildings need listed building consent for internal alterations.

Richmond decides applications and publishes detailed house extension guidance; Article 4 directions apply in several conservation areas.

What structural alterations in Richmond includes.

  • Architectural and structural design
  • Planning or lawful development certificate
  • Foundations, walls, roof and steels
  • Glazing, rooflights and doors
  • Kitchen designed and fitted
  • Building control and party wall handled
How we work

From site visit to handover.

  1. 01

    Site visit & consultation

    We visit, listen and measure. Brief, budget and constraints understood before any advice is given.

  2. 02

    Design & itemised quote

    Our architects and engineers draw the scheme, and from that we provide a transparent, itemised quotation for your approval.

  3. 03

    Planning & approvals

    Planning applications, building control and party wall matters handled for you.

  4. 04

    Build, managed weekly

    Our own trades, sequenced by a site manager. Progress reported every week.

  5. 05

    Handover & aftercare

    Joint snagging walk-through, documentation, and a guarantee on our workmanship.

Common questions

Structural Alterations in Richmond: your questions.

Can you remove a load-bearing wall in a Richmond house?

Yes. Our structural engineer designs the steel beam and padstones, building control inspects the work, and if the wall is a party wall we serve the notices. The beam can usually be concealed within the ceiling depth.

Do structural alterations need planning permission?

Internal structural work does not need planning permission, but it always needs building regulations approval. Listed buildings need listed building consent for internal alterations.

Which parts of Richmond do you cover?

All of Richmond and TW9 · TW10, including Richmond Hill, The Green, Kew Road, Sheen Road, Queens Road, Marlborough Road, and the neighbouring districts. We are based in London and our teams work across central, north, north-west, west and south-west London.

Start a project

Talk to us about structural work in Richmond.

We will visit, listen and explain what is possible for your property and how it would be approved. No pressure, no sales pitch.