Richmond · TW9 · TW10

Flat Refurbishment in Richmond, TW9

Refurbishment of flats and apartments in Richmond, from a single bathroom to a complete lateral conversion, with the licence to alter and the building's rules handled for you.

Covered under one contract

  • Strip-out, replastering and new ceilings
  • Rewiring and lighting design
  • Plumbing, boilers and underfloor heating
  • Structural openings and layout changes
  • Kitchens, bathrooms and joinery
  • Flooring, decoration and finishing
Call us on 07939 239238

Flat Refurbishment in Richmond.

Refurbishing a flat is a different job from refurbishing a house. The design questions are the same, but the approvals, the logistics and the neighbours are not. In Richmond most flats sit in mansion blocks or converted houses, which means a freeholder or managing agent to satisfy, restricted working hours, lift and stair access to plan, and sound insulation between floors to prove at inspection.

We handle all of it. Before work starts we prepare the drawings and method statements the freeholder needs for a licence to alter, agree deliveries and hours with the building, and protect the common parts. On site, our own team does the strip-out, services, joinery, kitchen, bathrooms and decoration, so the flat is closed up and finished in one continuous programme.

Because we supply the Italian and German kitchens and the bathroom furniture ourselves, we can design the whole flat as one scheme and order everything at once, which matters when access is difficult and every delivery has to be booked.

Flat Refurbishment across London

At a glance
Area
Richmond, TW9 · TW10
Council
London Borough of Richmond upon Thames
Housing
Georgian houses around the Green and on the Hill, Victorian villas and terraces, Edwardian family houses, riverside apartments
Transport
Richmond (District, Overground, rail), Kew Gardens
Scope
Strip-out to handover
Design stage
4 to 8 weeks
Build, two-bed flat
8 to 12 weeks
Contract
Written, itemised, fixed scope
Aftercare
Snagging and workmanship guarantee
South-West London

Richmond: the houses and the planning rules.

Richmond has Georgian houses around the Green and up the Hill, Victorian villas along the roads to the Park, and Edwardian streets between the station and Kew. The view from Richmond Hill is protected by Act of Parliament, and the conservation areas are among the most carefully managed in outer London.

Refurbishments here range from listed Georgian townhouses to Edwardian family houses that want a kitchen extension and a loft. The council's design guidance is detailed and its conservation officers are engaged, so the drawings and heritage statement are prepared to match.

The Richmond Town, Richmond Hill, Richmond Green and Kew Green conservation areas cover the centre and the riverside, and many houses are listed.

London Borough of Richmond upon Thames

Richmond decides applications and publishes detailed house extension guidance; Article 4 directions apply in several conservation areas.

Listed buildings

Around the Green and on the Hill most houses are listed; internal changes need listed building consent.

The view

The protected view from Richmond Hill and the Thames Policy Area affect roof extensions and riverside sites.

Approvals for flat refurbishment in Richmond.

Flats need a licence to alter from the freeholder or managing agent as well as building regulations approval; the sound insulation between flats is checked at inspection, and any change to the exterior, including windows, needs planning permission.

Richmond decides applications and publishes detailed house extension guidance; Article 4 directions apply in several conservation areas.

What flat refurbishment in Richmond includes.

  • Strip-out, replastering and new ceilings
  • Rewiring and lighting design
  • Plumbing, boilers and underfloor heating
  • Structural openings and layout changes
  • Kitchens, bathrooms and joinery
  • Flooring, decoration and finishing
How we work

From site visit to handover.

  1. 01

    Site visit & consultation

    We visit, listen and measure. Brief, budget and constraints understood before any advice is given.

  2. 02

    Design & itemised quote

    Our architects and engineers draw the scheme, and from that we provide a transparent, itemised quotation for your approval.

  3. 03

    Planning & approvals

    Planning applications, building control and party wall matters handled for you.

  4. 04

    Build, managed weekly

    Our own trades, sequenced by a site manager. Progress reported every week.

  5. 05

    Handover & aftercare

    Joint snagging walk-through, documentation, and a guarantee on our workmanship.

Common questions

Flat Refurbishment in Richmond: your questions.

Do I need the freeholder's permission to refurbish a flat in Richmond?

Almost always, through a licence to alter. We prepare the drawings and method statements the freeholder or managing agent asks for and build their approval time into the programme so it does not hold up the start.

How long does a flat refurbishment take?

A two-bedroom flat typically takes eight to twelve weeks on site once approvals are in place. Lift access, parking and the block's working hours all affect the programme, so we plan around them from the outset.

Which parts of Richmond do you cover?

All of Richmond and TW9 · TW10, including Richmond Hill, The Green, Kew Road, Sheen Road, Queens Road, Marlborough Road, and the neighbouring districts. We are based in London and our teams work across central, north, north-west, west and south-west London.

Start a project

Talk to us about a flat refurbishment in Richmond.

We will visit, listen and explain what is possible for your property and how it would be approved. No pressure, no sales pitch.