Knightsbridge · SW7 · SW1X

Flat Refurbishment in Knightsbridge, SW7

Refurbishment of flats and apartments in Knightsbridge, from a single bathroom to a complete lateral conversion, with the licence to alter and the building's rules handled for you.

Covered under one contract

  • Strip-out, replastering and new ceilings
  • Rewiring and lighting design
  • Plumbing, boilers and underfloor heating
  • Structural openings and layout changes
  • Kitchens, bathrooms and joinery
  • Flooring, decoration and finishing
Call us on 07939 239238

Flat Refurbishment in Knightsbridge.

Refurbishing a flat is a different job from refurbishing a house. The design questions are the same, but the approvals, the logistics and the neighbours are not. In Knightsbridge most flats sit in mansion blocks or converted houses, which means a freeholder or managing agent to satisfy, restricted working hours, lift and stair access to plan, and sound insulation between floors to prove at inspection.

We handle all of it. Before work starts we prepare the drawings and method statements the freeholder needs for a licence to alter, agree deliveries and hours with the building, and protect the common parts. On site, our own team does the strip-out, services, joinery, kitchen, bathrooms and decoration, so the flat is closed up and finished in one continuous programme.

Because we supply the Italian and German kitchens and the bathroom furniture ourselves, we can design the whole flat as one scheme and order everything at once, which matters when access is difficult and every delivery has to be booked.

Flat Refurbishment across London

At a glance
Area
Knightsbridge, SW7 · SW1X
Council
Royal Borough of Kensington and Chelsea and City of Westminster
Housing
Red-brick Dutch-gabled terraces of the Cadogan estate, stucco squares around Brompton and Thurloe, mews houses and lateral apartments
Transport
Knightsbridge, South Kensington, Sloane Square
Scope
Strip-out to handover
Design stage
4 to 8 weeks
Build, two-bed flat
8 to 12 weeks
Contract
Written, itemised, fixed scope
Aftercare
Snagging and workmanship guarantee
Central London

Knightsbridge: the houses and the planning rules.

Knightsbridge is estate London at its most exacting. The Cadogan estate's red-brick Queen Anne terraces around Hans Place and Pont Street, the stucco squares of Thurloe and Brompton, and the mews behind them are all in conservation areas, much of it listed, and the estates have their own design requirements on top of the borough's.

Refurbishments here are mostly of lateral flats and mews houses, with kitchens, bathrooms and joinery specified to a very high standard and delivered around the constraints of estate consent, porters, lifts and neighbours who expect quiet. We have worked to these rules for many years, starting a mile north in Marylebone.

The Knightsbridge, Hans Town, Brompton and Thurloe Estate conservation areas cover the whole district.

Two councils

The boundary between RBKC and Westminster runs through the district; we check which authority applies at the first visit and prepare the application to its requirements.

Estate consent

The Cadogan and Wellcome estates require their own approval for alterations, with detailed guidance on windows, roofs and mews frontages.

Flats

Almost all the housing is flats, so licences to alter, block working hours and structural sign-off from the freeholder's surveyor form part of every programme.

Approvals for flat refurbishment in Knightsbridge.

Flats need a licence to alter from the freeholder or managing agent as well as building regulations approval; the sound insulation between flats is checked at inspection, and any change to the exterior, including windows, needs planning permission.

The boundary between RBKC and Westminster runs through the district; we check which authority applies at the first visit and prepare the application to its requirements.

What flat refurbishment in Knightsbridge includes.

  • Strip-out, replastering and new ceilings
  • Rewiring and lighting design
  • Plumbing, boilers and underfloor heating
  • Structural openings and layout changes
  • Kitchens, bathrooms and joinery
  • Flooring, decoration and finishing
How we work

From site visit to handover.

  1. 01

    Site visit & consultation

    We visit, listen and measure. Brief, budget and constraints understood before any advice is given.

  2. 02

    Design & itemised quote

    Our architects and engineers draw the scheme, and from that we provide a transparent, itemised quotation for your approval.

  3. 03

    Planning & approvals

    Planning applications, building control and party wall matters handled for you.

  4. 04

    Build, managed weekly

    Our own trades, sequenced by a site manager. Progress reported every week.

  5. 05

    Handover & aftercare

    Joint snagging walk-through, documentation, and a guarantee on our workmanship.

Common questions

Flat Refurbishment in Knightsbridge: your questions.

Do I need the freeholder's permission to refurbish a flat in Knightsbridge?

Almost always, through a licence to alter. We prepare the drawings and method statements the freeholder or managing agent asks for and build their approval time into the programme so it does not hold up the start.

How long does a flat refurbishment take?

A two-bedroom flat typically takes eight to twelve weeks on site once approvals are in place. Lift access, parking and the block's working hours all affect the programme, so we plan around them from the outset.

Which parts of Knightsbridge do you cover?

All of Knightsbridge and SW7 · SW1X, including Hans Place, Pont Street, Cadogan Square, Thurloe Square, Brompton Road, Egerton Gardens, and the neighbouring districts. We are based in London and our teams work across central, north, north-west, west and south-west London.

Start a project

Talk to us about a flat refurbishment in Knightsbridge.

We will visit, listen and explain what is possible for your property and how it would be approved. No pressure, no sales pitch.