St John's Wood · NW8

Flat Refurbishment in St John's Wood, NW8

Refurbishment of flats and apartments in St John's Wood, from a single bathroom to a complete lateral conversion, with the licence to alter and the building's rules handled for you.

Covered under one contract

  • Strip-out, replastering and new ceilings
  • Rewiring and lighting design
  • Plumbing, boilers and underfloor heating
  • Structural openings and layout changes
  • Kitchens, bathrooms and joinery
  • Flooring, decoration and finishing
Call us on 07939 239238

Flat Refurbishment in St John's Wood.

Refurbishing a flat is a different job from refurbishing a house. The design questions are the same, but the approvals, the logistics and the neighbours are not. In St John's Wood most flats sit in mansion blocks or converted houses, which means a freeholder or managing agent to satisfy, restricted working hours, lift and stair access to plan, and sound insulation between floors to prove at inspection.

We handle all of it. Before work starts we prepare the drawings and method statements the freeholder needs for a licence to alter, agree deliveries and hours with the building, and protect the common parts. On site, our own team does the strip-out, services, joinery, kitchen, bathrooms and decoration, so the flat is closed up and finished in one continuous programme.

Because we supply the Italian and German kitchens and the bathroom furniture ourselves, we can design the whole flat as one scheme and order everything at once, which matters when access is difficult and every delivery has to be booked.

Flat Refurbishment across London

At a glance
Area
St John's Wood, NW8
Council
City of Westminster
Housing
Italianate stucco villas, Victorian semi-detached houses, red-brick mansion blocks and 1930s apartment buildings
Transport
St John's Wood (Jubilee)
Scope
Strip-out to handover
Design stage
4 to 8 weeks
Build, two-bed flat
8 to 12 weeks
Contract
Written, itemised, fixed scope
Aftercare
Snagging and workmanship guarantee
Central London

St John's Wood: the houses and the planning rules.

St John's Wood was London's first garden suburb of villas, laid out from the 1820s, and much of that character survives: paired stucco villas set back behind front gardens, later Victorian houses on the roads towards Maida Vale, and the mansion blocks and 1930s apartment buildings along Wellington Road and St John's Wood Road. Abbey Road and Lord's sit at its edges, Regent's Park to the south.

For owners that means large, well-proportioned rooms, deep plots that suit rear extensions and basements, and a planning authority, Westminster, that expects any change to respect the villa character. We have fitted kitchens on Abbey Road and in the roads off the High Street, and we know which streets carry the tighter controls.

The St John's Wood Conservation Area covers most of the district.

Westminster City Council

Westminster decides planning and listed building applications. The St John's Wood Conservation Area removes some permitted development rights, so many rear extensions and roof changes need a full application.

Villas and gardens

Extensions are judged on their effect on the villa form and on garden space; basements need a Basement Impact Assessment under Westminster's basement policy.

Flats and mansion blocks

Refurbishing a flat usually needs a licence to alter from the freeholder or block management in addition to building regulations.

Approvals for flat refurbishment in St John's Wood.

Flats need a licence to alter from the freeholder or managing agent as well as building regulations approval; the sound insulation between flats is checked at inspection, and any change to the exterior, including windows, needs planning permission.

Westminster decides planning and listed building applications. The St John's Wood Conservation Area removes some permitted development rights, so many rear extensions and roof changes need a full application.

What flat refurbishment in St John's Wood includes.

  • Strip-out, replastering and new ceilings
  • Rewiring and lighting design
  • Plumbing, boilers and underfloor heating
  • Structural openings and layout changes
  • Kitchens, bathrooms and joinery
  • Flooring, decoration and finishing
How we work

From site visit to handover.

  1. 01

    Site visit & consultation

    We visit, listen and measure. Brief, budget and constraints understood before any advice is given.

  2. 02

    Design & itemised quote

    Our architects and engineers draw the scheme, and from that we provide a transparent, itemised quotation for your approval.

  3. 03

    Planning & approvals

    Planning applications, building control and party wall matters handled for you.

  4. 04

    Build, managed weekly

    Our own trades, sequenced by a site manager. Progress reported every week.

  5. 05

    Handover & aftercare

    Joint snagging walk-through, documentation, and a guarantee on our workmanship.

Common questions

Flat Refurbishment in St John's Wood: your questions.

Do I need the freeholder's permission to refurbish a flat in St John's Wood?

Almost always, through a licence to alter. We prepare the drawings and method statements the freeholder or managing agent asks for and build their approval time into the programme so it does not hold up the start.

How long does a flat refurbishment take?

A two-bedroom flat typically takes eight to twelve weeks on site once approvals are in place. Lift access, parking and the block's working hours all affect the programme, so we plan around them from the outset.

Which parts of St John's Wood do you cover?

All of St John's Wood and NW8, including Abbey Road, Hamilton Terrace, Loudoun Road, Wellington Road, Circus Road, St John's Wood High Street, and the neighbouring districts. We are based in London and our teams work across central, north, north-west, west and south-west London.

Start a project

Talk to us about a flat refurbishment in St John's Wood.

We will visit, listen and explain what is possible for your property and how it would be approved. No pressure, no sales pitch.