Highgate · N6

Bathroom Renovation in Highgate, N6

Bathroom design and installation in Highgate: family bathrooms, en-suites and wet rooms, designed as complete rooms and fitted by our own trades.

Covered under one contract

  • Design and 3D layout
  • Italian and German made-to-measure kitchens
  • Worktops templated and fitted
  • Built-in appliances supplied and installed
  • Bathrooms designed as complete rooms
  • Plumbing, electrics and tiling by our own trades
Call us on 07939 239238

Bathroom Renovation in Highgate.

A bathroom is a small room where everything has to be right at once: the layout, the tiling, the underfloor heating, the lighting, the furniture and the brassware. We design it as a whole and fit it with our own plumbers, electricians and tilers, which is why our bathrooms in Highgate and across London are finished to a showroom standard.

Many of the bathrooms we do are in older houses and flats, where the questions are practical: where the soil stack is, whether an en-suite can be squeezed from a bedroom or landing, how to ventilate an internal room. We answer them at the site visit before anything is drawn.

Sanitaryware, furniture and tiles are chosen from samples we bring to you, and a typical bathroom takes two to three weeks on site from strip-out to finished brassware once the design is agreed and the materials have arrived.

Bathroom Renovation across London

At a glance
Area
Highgate, N6
Council
London Borough of Camden and London Borough of Haringey
Housing
Georgian houses in the village, Victorian villas on the slopes, 1930s and post-war houses on the Holly Lodge and Highgate estates
Transport
Highgate, Archway
Bathroom refit
2 to 3 weeks
Ranges
Aster Cucine (Italy), Schüller (Germany)
North London

Highgate: the houses and the planning rules.

Highgate village sits on the hill above the Heath, a cluster of Georgian houses around the High Street and Pond Square, with large Victorian villas on the slopes towards the cemetery and Hampstead Lane, and 1930s and modernist houses on the estates around Highgate Wood. The conservation area is one of the oldest in London.

The houses are individual and so are the projects: restoring Georgian interiors, extending Victorian villas across steep gardens, and modernising mid-century houses while respecting their architecture. Two boroughs meet here, and we handle whichever one applies.

The Highgate Conservation Area covers the village and surrounding streets, and many of the older houses are listed.

Camden and Haringey

The borough boundary crosses the village; Camden covers the west side and Haringey the east, each with its own conservation area guidance and application process.

Listed houses

Much of the High Street, the Grove and Pond Square is listed, so internal work needs listed building consent.

Slopes and trees

Steep sites and protected trees affect extensions and basements; a topographical and tree survey is the starting point.

Approvals for bathroom renovation in Highgate.

Bathrooms do not need planning permission, but new plumbing, electrics in wet zones and ventilation need building regulations approval, and flats usually need the freeholder's consent for changes to services.

The borough boundary crosses the village; Camden covers the west side and Haringey the east, each with its own conservation area guidance and application process.

What bathroom renovation in Highgate includes.

  • Design and 3D layout
  • Italian and German made-to-measure kitchens
  • Worktops templated and fitted
  • Built-in appliances supplied and installed
  • Bathrooms designed as complete rooms
  • Plumbing, electrics and tiling by our own trades
How we work

From site visit to handover.

  1. 01

    Site visit & consultation

    We visit, listen and measure. Brief, budget and constraints understood before any advice is given.

  2. 02

    Design & itemised quote

    Our architects and engineers draw the scheme, and from that we provide a transparent, itemised quotation for your approval.

  3. 03

    Planning & approvals

    Planning applications, building control and party wall matters handled for you.

  4. 04

    Build, managed weekly

    Our own trades, sequenced by a site manager. Progress reported every week.

  5. 05

    Handover & aftercare

    Joint snagging walk-through, documentation, and a guarantee on our workmanship.

Common questions

Bathroom Renovation in Highgate: your questions.

How long does a bathroom refit take?

Two to three weeks on site from strip-out to finished tiling and brassware, once the design is agreed and the sanitaryware has arrived.

Can you add an en-suite in a Highgate house?

Usually, by taking space from a bedroom or a landing. Drainage falls and soil stack positions decide where it can go; we check these at the site visit before drawing options.

Which parts of Highgate do you cover?

All of Highgate and N6, including The Grove, Highgate High Street, Southwood Lane, Hampstead Lane, Bisham Gardens, Fitzroy Park, and the neighbouring districts. We are based in London and our teams work across central, north, north-west, west and south-west London.

Start a project

Talk to us about a new bathroom in Highgate.

We will visit, listen and explain what is possible for your property and how it would be approved. No pressure, no sales pitch.