Bathroom Renovation in Holland Park, W11
Bathroom design and installation in Holland Park: family bathrooms, en-suites and wet rooms, designed as complete rooms and fitted by our own trades.
Covered under one contract
- Design and 3D layout
- Italian and German made-to-measure kitchens
- Worktops templated and fitted
- Built-in appliances supplied and installed
- Bathrooms designed as complete rooms
- Plumbing, electrics and tiling by our own trades
Bathroom Renovation in Holland Park.
A bathroom is a small room where everything has to be right at once: the layout, the tiling, the underfloor heating, the lighting, the furniture and the brassware. We design it as a whole and fit it with our own plumbers, electricians and tilers, which is why our bathrooms in Holland Park and across London are finished to a showroom standard.
Many of the bathrooms we do are in older houses and flats, where the questions are practical: where the soil stack is, whether an en-suite can be squeezed from a bedroom or landing, how to ventilate an internal room. We answer them at the site visit before anything is drawn.
Sanitaryware, furniture and tiles are chosen from samples we bring to you, and a typical bathroom takes two to three weeks on site from strip-out to finished brassware once the design is agreed and the materials have arrived.
- Area
- Holland Park, W11 · W14
- Council
- Royal Borough of Kensington and Chelsea
- Housing
- Large detached and semi-detached Victorian villas, stucco terraces, artists' studio houses on Melbury Road and mansion flats
- Transport
- Holland Park, Kensington (Olympia)
- Bathroom refit
- 2 to 3 weeks
- Ranges
- Aster Cucine (Italy), Schüller (Germany)
Holland Park: the houses and the planning rules.
Holland Park has the largest houses in west London: detached Italianate villas on Holland Park itself and Addison Road, the studio houses built for Victorian painters on Melbury Road, and the stucco crescents of Norland. Plots are generous, gardens are deep and the planning authority protects both.
The work we see here is at the top end of the residential market: whole-house refurbishments with new services, basements under the larger villas, garden rooms and pool houses, and interiors finished to a standard that matches the architecture. Programmes run for months, and coordination with neighbours and the borough is part of the job.
The Norland, Holland Park and Royal Crescent conservation areas cover the district, and many of the villas are listed.
Royal Borough of Kensington and Chelsea
RBKC decides applications. Detached villas are assessed on their setting within the conservation area, and roof extensions and side additions are tightly controlled.
Basements
Large plots make basements possible but the borough's single-storey, half-garden limit still applies, with a full impact assessment.
Listed studio houses
The Melbury Road studio houses are listed; internal changes need listed building consent and specialist heritage input.
Approvals for bathroom renovation in Holland Park.
Bathrooms do not need planning permission, but new plumbing, electrics in wet zones and ventilation need building regulations approval, and flats usually need the freeholder's consent for changes to services.
RBKC decides applications. Detached villas are assessed on their setting within the conservation area, and roof extensions and side additions are tightly controlled.
What bathroom renovation in Holland Park includes.
- Design and 3D layout
- Italian and German made-to-measure kitchens
- Worktops templated and fitted
- Built-in appliances supplied and installed
- Bathrooms designed as complete rooms
- Plumbing, electrics and tiling by our own trades
From site visit to handover.
- 01
Site visit & consultation
We visit, listen and measure. Brief, budget and constraints understood before any advice is given.
- 02
Design & itemised quote
Our architects and engineers draw the scheme, and from that we provide a transparent, itemised quotation for your approval.
- 03
Planning & approvals
Planning applications, building control and party wall matters handled for you.
- 04
Build, managed weekly
Our own trades, sequenced by a site manager. Progress reported every week.
- 05
Handover & aftercare
Joint snagging walk-through, documentation, and a guarantee on our workmanship.
Bathroom Renovation in Holland Park: your questions.
How long does a bathroom refit take?
Two to three weeks on site from strip-out to finished tiling and brassware, once the design is agreed and the sanitaryware has arrived.
Can you add an en-suite in a Holland Park house?
Usually, by taking space from a bedroom or a landing. Drainage falls and soil stack positions decide where it can go; we check these at the site visit before drawing options.
Which parts of Holland Park do you cover?
All of Holland Park and W11 · W14, including Holland Park, Addison Road, Melbury Road, Royal Crescent, Holland Villas Road, Abbotsbury Road, and the neighbouring districts. We are based in London and our teams work across central, north, north-west, west and south-west London.
Other services in Holland Park.

House Refurbishment in Holland Park
Read more
Flat Refurbishment in Holland Park
Read more
House Extensions in Holland Park
Read more
Structural Alterations in Holland Park
Read more
Loft Conversions in Holland Park
Read more
Basement Conversions in Holland Park
Read more
Kitchen Renovation in Holland Park
Read more
Bespoke Joinery & Fitted Furniture in Holland Park
Read more
Architectural & Interior Design in Holland Park
Read more
Planning Permission & Building Regulations in Holland Park
Read moreBathroom Renovation across London.
Central London
All of Central LondonNorth London
All of North LondonNorth-West London
All of North-West LondonTalk to us about a new bathroom in Holland Park.
We will visit, listen and explain what is possible for your property and how it would be approved. No pressure, no sales pitch.
