Bayswater · W2

Bathroom Renovation in Bayswater, W2

Bathroom design and installation in Bayswater: family bathrooms, en-suites and wet rooms, designed as complete rooms and fitted by our own trades.

Covered under one contract

  • Design and 3D layout
  • Italian and German made-to-measure kitchens
  • Worktops templated and fitted
  • Built-in appliances supplied and installed
  • Bathrooms designed as complete rooms
  • Plumbing, electrics and tiling by our own trades
Call us on 07939 239238

Bathroom Renovation in Bayswater.

A bathroom is a small room where everything has to be right at once: the layout, the tiling, the underfloor heating, the lighting, the furniture and the brassware. We design it as a whole and fit it with our own plumbers, electricians and tilers, which is why our bathrooms in Bayswater and across London are finished to a showroom standard.

Many of the bathrooms we do are in older houses and flats, where the questions are practical: where the soil stack is, whether an en-suite can be squeezed from a bedroom or landing, how to ventilate an internal room. We answer them at the site visit before anything is drawn.

Sanitaryware, furniture and tiles are chosen from samples we bring to you, and a typical bathroom takes two to three weeks on site from strip-out to finished brassware once the design is agreed and the materials have arrived.

Bathroom Renovation across London

At a glance
Area
Bayswater, W2
Council
City of Westminster
Housing
Stucco terraces and garden squares, mansion flats, houses converted to flats, mews
Transport
Bayswater, Queensway, Lancaster Gate
Bathroom refit
2 to 3 weeks
Ranges
Aster Cucine (Italy), Schüller (Germany)
Central London

Bayswater: the houses and the planning rules.

Bayswater's white stucco terraces and garden squares were built in the mid-nineteenth century to rival Belgravia, and most have since been divided into flats. Behind them lie mews, and along Bayswater Road and Queensway the mansion blocks and hotels. The whole district is a conservation area under Westminster.

We fitted a kitchen here with a metallic red high-gloss island, black tall units and an 80 mm Corian worktop, a good example of how a bold contemporary kitchen can sit inside a stucco building without touching the historic fabric.

The Bayswater Conservation Area covers most of the district.

Westminster City Council

Applications go to Westminster. Conservation-area policies protect the stucco fronts, rear elevations facing squares and the mews.

Converted houses

In converted terraces, changes to shared services, structure and soundproofing between flats need building regulations approval and often a licence to alter.

Basements

Westminster's basement policy applies; light wells and pavement vaults have particular rules.

Approvals for bathroom renovation in Bayswater.

Bathrooms do not need planning permission, but new plumbing, electrics in wet zones and ventilation need building regulations approval, and flats usually need the freeholder's consent for changes to services.

Applications go to Westminster. Conservation-area policies protect the stucco fronts, rear elevations facing squares and the mews.

What bathroom renovation in Bayswater includes.

  • Design and 3D layout
  • Italian and German made-to-measure kitchens
  • Worktops templated and fitted
  • Built-in appliances supplied and installed
  • Bathrooms designed as complete rooms
  • Plumbing, electrics and tiling by our own trades
How we work

From site visit to handover.

  1. 01

    Site visit & consultation

    We visit, listen and measure. Brief, budget and constraints understood before any advice is given.

  2. 02

    Design & itemised quote

    Our architects and engineers draw the scheme, and from that we provide a transparent, itemised quotation for your approval.

  3. 03

    Planning & approvals

    Planning applications, building control and party wall matters handled for you.

  4. 04

    Build, managed weekly

    Our own trades, sequenced by a site manager. Progress reported every week.

  5. 05

    Handover & aftercare

    Joint snagging walk-through, documentation, and a guarantee on our workmanship.

Common questions

Bathroom Renovation in Bayswater: your questions.

How long does a bathroom refit take?

Two to three weeks on site from strip-out to finished tiling and brassware, once the design is agreed and the sanitaryware has arrived.

Can you add an en-suite in a Bayswater house?

Usually, by taking space from a bedroom or a landing. Drainage falls and soil stack positions decide where it can go; we check these at the site visit before drawing options.

Which parts of Bayswater do you cover?

All of Bayswater and W2, including Queensway, Westbourne Terrace, Cleveland Square, Leinster Square, Porchester Terrace, Sussex Gardens, and the neighbouring districts. We are based in London and our teams work across central, north, north-west, west and south-west London.

Start a project

Talk to us about a new bathroom in Bayswater.

We will visit, listen and explain what is possible for your property and how it would be approved. No pressure, no sales pitch.