Belgravia · SW1X · SW1W

House Refurbishment in Belgravia, SW1X

Whole-house refurbishment in Belgravia: new services, reworked layouts, kitchens, bathrooms and restored period detail, delivered by one team under one contract.

Covered under one contract

  • Strip-out, replastering and new ceilings
  • Rewiring and lighting design
  • Plumbing, boilers and underfloor heating
  • Structural openings and layout changes
  • Kitchens, bathrooms and joinery
  • Flooring, decoration and finishing
Call us on 07939 239238

House Refurbishment in Belgravia.

A full refurbishment is the project that resets a house. In Belgravia it usually means stripping back to the structure, rewiring and replumbing, replanning the ground floor around a new kitchen, fitting new bathrooms and then bringing back the detail that gives the house its character: cornices, joinery, fireplaces and sash windows.

We run the whole job. Our architects draw the new layout, our engineers design any structural openings, and our own site team builds it, so there is one programme, one quotation and one person to call. Kitchens and bathrooms are designed and supplied by us rather than by a subcontractor.

Every refurbishment starts with a site visit and a measured survey. From that we produce drawings, an itemised specification and a programme, so you know exactly what is being done before anyone lifts a tool.

House Refurbishment across London

At a glance
Area
Belgravia, SW1X · SW1W
Council
City of Westminster
Housing
Grade II listed white stucco terraces and squares by Thomas Cubitt, mews houses, embassies converted back to homes, and apartments
Transport
Sloane Square, Victoria, Hyde Park Corner
Scope
Strip-out to handover
Design stage
4 to 8 weeks
Build, whole house
4 to 6 months
Contract
Written, itemised, fixed scope
Aftercare
Snagging and workmanship guarantee
Central London

Belgravia: the houses and the planning rules.

Belgravia was built by Thomas Cubitt for the Grosvenor estate in the 1820s and 1830s and it has barely changed since: cream stucco terraces around Eaton Square, Belgrave Square and Chester Square, with cobbled mews behind. The whole district is a conservation area, most houses are listed, and the Grosvenor estate remains the freeholder of much of it.

Work here is nearly always to a listed building, which means listed building consent, a heritage statement and an approach that treats the historic fabric as the priority. Within that we fit kitchens, bathrooms, joinery and services to modern standards, and convert mews houses into complete homes.

The Belgravia Conservation Area covers the whole district, and the majority of the houses are Grade II or II* listed.

Westminster City Council

Westminster decides planning and listed building applications for the whole of Belgravia, with detailed conservation area guidance and long-standing policies on roof extensions and basements.

Grosvenor estate

Grosvenor's own consent is required for most alterations on the estate, with its own design guidance and surveyors.

Listed interiors

Cornices, staircases, chimneypieces and joinery are part of the listing; changes need consent and specialist trades.

Approvals for house refurbishment in Belgravia.

Internal refurbishment does not normally need planning permission, but it does need building regulations approval for structural work, electrics, plumbing and insulation, and listed houses need listed building consent for most internal changes.

Westminster decides planning and listed building applications for the whole of Belgravia, with detailed conservation area guidance and long-standing policies on roof extensions and basements.

What house refurbishment in Belgravia includes.

  • Strip-out, replastering and new ceilings
  • Rewiring and lighting design
  • Plumbing, boilers and underfloor heating
  • Structural openings and layout changes
  • Kitchens, bathrooms and joinery
  • Flooring, decoration and finishing
How we work

From site visit to handover.

  1. 01

    Site visit & consultation

    We visit, listen and measure. Brief, budget and constraints understood before any advice is given.

  2. 02

    Design & itemised quote

    Our architects and engineers draw the scheme, and from that we provide a transparent, itemised quotation for your approval.

  3. 03

    Planning & approvals

    Planning applications, building control and party wall matters handled for you.

  4. 04

    Build, managed weekly

    Our own trades, sequenced by a site manager. Progress reported every week.

  5. 05

    Handover & aftercare

    Joint snagging walk-through, documentation, and a guarantee on our workmanship.

Common questions

House Refurbishment in Belgravia: your questions.

How long does a house refurbishment take in Belgravia?

A whole house with structural changes, a new kitchen and two or three bathrooms usually takes four to six months on site. We give a written programme with the quotation and report progress weekly.

Can I stay in the house during the work?

For a partial refurbishment, usually yes: we keep a bathroom and a basic kitchen working and seal off the rooms we are in. For a full strip-out it is faster, cleaner and cheaper to move out for the duration.

Which parts of Belgravia do you cover?

All of Belgravia and SW1X · SW1W, including Eaton Square, Chester Square, Belgrave Square, Elizabeth Street, Eaton Terrace, Chester Row, and the neighbouring districts. We are based in London and our teams work across central, north, north-west, west and south-west London.

Start a project

Talk to us about a house refurbishment in Belgravia.

We will visit, listen and explain what is possible for your property and how it would be approved. No pressure, no sales pitch.